Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Planning Transaction Conditions

The System Transaction Codes are displayed with both the Code Names and Descriptions. The Code Descriptions directly illustrate their functionality and role in the system, as fields are populated and tasks are performed.

The Planning Transaction Conditions is hard-coded to include the following transactions:

  • Plan Start Date Overdue
  • The Work Due Has Had A Planned Start Date Set By Planning
  • Plan Start Date Within 3 Days of Next Due Date
  • Plan Start Date Set Via E/C

Transaction Code:

Planning Transaction

General Description:

Colors assigned to maintenance events depending on their status concerning due date and planned date.

Authorization Steps Available:

None

System Notification Available:

None

Control Panel Path(s):

Planning/Query/A/C Planning Query, Detail

Window(s):

w_ac_planning_sel

Related Switch(s):

None

Functions:

Color-code maintenance events according to the due-status.

Reports:

None

 

Available Functionality:

See Also

Planning Transaction Codes

Absence Category

Absence Category Authorization Group

Capability Area

Employee Attendance Transaction Type

Long Term Planning Drivers Buffers

Planning Employee Capacity

Schedule Override Authorization Group

Simulation Category

Simulation Category Group

Top of Page Publication Date: 11/12/2024 Share Print