Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Transfer E/C Button, via GSE W/O Engineering Control

Select the Transfer E/C button to transfer the currently selected E/C to another selected Shop Work Order. Any Task Cards that are associated with the E/C will also be transferred.

Create a work order and Select the E/C but_ec_small button. Be sure the Hand but_hand_pointer Selection is pointing to the E/C to be transferred. Select the Transfer E/C button.

The A/C or P/N S/N must be the same on the Transfer To Work Order as the current Work Order. Select the Transfer E/C button. The Drop Down Selection window appears. Select the work order that is to be transferred.

A soft-warning will appear. Click Yes to transfer the E/C.

The E/C will then appear on the designated Transfer To Work Order.

See Also

E/C Button, via GSE W/O Detail

GSE W/O Engineering Control, Informational Tab

Notes Button, via GSE W/O Engineering Control

Task Card Button, via GSE W/O Engineering Control

Attachment Button, via GSE W/O Engineering Control

Top of Page Publication Date: 11/12/2024 Share Print