Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Effectivity Button, via Contract Order Detail

Select the A/C Effectivity button to view A/C Effectivity for a part in the Contract Order Detail line item. Aircraft effectivity for parts is needed, for example, in order to be allowed to install parts only on those aircraft they are effective to. A part's A/C Effectivity is a vital configuration that affects multiple types of transactions throughout eMRO.

When the button is selected, the P/N Effectivity appears as follows.

 

The following information/options are available in this window:
_____________________________________________________________________________________

Expand but_expand / Collapse but_collapse buttons

Use these buttons to view all of a fleet's aircraft or to hide all of a fleet's aircraft. Once expanded, individual aircraft can be selected or deselected for effectivity.

A/C Type/Series but_select_type_series_small button

Indicates the entire Type/Series' effectivity.

Individual A/C checkbox - Indicates individual aircraft effectivity.

subcheck

P/N Range but_pn_range button

Select this button to apply effectivity to a range of specified S/N Line items or to a range of IPCs. For additional information, refer to the P/N Range Button, via the P/N Master Buttons of the Settings Training Manual.

ALL

Indicates that all aircraft for the selected type/series are effective. If only one available Type/series is selected, but all of the aircraft within that type/series are selected, the effectivity is classified as ‘ALL.’

PARTIALLY

Indicates that some but not all aircraft for the selected type/series are effective. If multiple type/series are selected, but one of the selected type/series has aircraft within that are not selected, the effectivity is classified as ‘Partially.’

_____________________________________________________________________________________

In This Section

Effectivity Audit Button, via P/N Effectivity

See Also

Contract Order Detail Buttons

Notes Button, via Contract Order Detail

Attachment Button, via Contract Order Detail

AWB Button, via Contract Order Detail

Force P/O Button, via Contract Order Detail

Audit Button, via Contract Order Detail

Release For Authorization Button, via Contract Order Detail

Engineering Order Button, via Contract Order Detail

Interchangeable Button, via Contract Order Detail

Inventory Query Button, via Contract Order Detail

History Button, via Contract Order Detail

Top of Page Publication Date: 11/12/2024 Share Print