Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Override Button, via Engineering Control (Shop) P/N

Select the Override but_override_small button to apply specific P/N S/N Effectivity if required.

 

Select Checkbox - Click to make the E/C not Effective against the currently selected P/N S/N.

At default all P/N S/Ns will be selected. If many P/N S/Ns are listed here, select the Select All button, and then just remove the S/Ns that you do not require by deselecting (un-checking) as necessary.

To view details regarding the currently selected P/N S/N, select the P/N and S/N button.

To include additional information, select the Notes eMRO_but_Note_Main and/or Attachment buttons. To view past information relating to the record, select the Audit button.

In This Section

Notes Button, via Engineering (Shop) Effectivity Override

Attachment Button, via Engineering (Shop) Effectivity Override

P/N and S/N Button, via Engineering (Shop) Effectivity Override

Audit Button, via Engineering (Shop) Effectivity Override

See Also

Engineering Control (Shop) P/N Buttons

Notes Button, via Engineering Control (Shop) P/N

Attachment Button, via Engineering Control (Shop) P/N

Audit Button, via Engineering Control (Shop) P/N

Top of Page Publication Date: 11/12/2024 Share Print