Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
The Labor Analysis When an E/C is brought into a Work Order, the T/C is also brought in the the Work Order. If a defect is found on the aircraft, a Non-routine Task Card is created. and any labor that is associated to the Non-routine Task Card is therefore linked to the E/C. From the Engineering Control Optional Tab, select the Labor Analysis |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||