Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
Control Button, via Shop W/O Post CompletionSelect the Control This window allows users to update the Engineering Control for the selected Shop Work Order. It the dependency (i.e the Task Card) on this E/C has been completed, deferred, or canceled, updates to the following editable fields (Status, Function and Reset Date) can only be updated via this window. If the dependency has not been closed, updates to the E/C can be done via the Engineering Control |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||