The E/C Task Card Group functionality works as follows:

In this example, we have associated several Task Cards to the Engineering Control (0500248-01).

First, a Work Order must be created via either Shop or Production/ Update/ Work Order. This will be the primary Work Order. The E/C is attached to the primary Work Order. Any Task Cards contained in Group 1 will automatically be copied to the primary Work Order during this process. Group 2 Task Cards will automatically be placed on an auto created Work Order, then Group 3, and so on. The primary Work Order will act as a Parent Work Order to each individual Work Order that is automatically created.

A diagram and explanation of the result of this Grouping is shown below:

ENG_group via EC7

For example, the E/C (0500248-01) is attached to the W/O (607691) via the E/C but_ec_small button of the Work Order window.

Once the E/C is attached, all Task Cards from Group 1 are automatically attached to the W/O.

From the primary W/O, notice that a sub-W/O was automatically created.

Notice that the Group 2 Task Cards have been attached to the sub-W/O.

If the E/C has any additional Task Cards in Groups 3 or higher, then sub-W/Os will be created for each Task Card Group level required.

See Also

Task Card Control Button, via Engineering Control Shop Detail

Engineering (Shop) Task Card Control, Informational Tab

Notes Button, via Engineering (Shop) Task Card Control

Multi Task Card Select Button, via Engineering (Shop) Task Card Control

Audit Button, via Engineering (Shop) Task Card Control

Top of Page Publication Date: 11/12/2024 Share Print