Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

GSE Template Button, via GSE Master

The Template but_template_small button automatically creates a GSE template by copying 'properties' (P/N Effectivity, P/N Positions, E/Cs, and Task Cards) to the currently selected record. The P/N Effectivity, P/N Positions, E/Cs, and Task Cards must be previously set up and made effective to the GSE Type/Series that is defined on the currently selected record.

Note: The A/C Master Template can only be performed for a particular item one time. Once the template is created, its different sections can be updated, as required, through various means within the system. The product of the GSE Template is the 'Perfect' assembly. Upon attempting to create a Template that has already been loaded, the following error appears:

Once completed, verification and auditing of this information should be mandatory to ensure correct compliance information.

Select the Template but_template_small button to open the GSE Master Template pop-up window.

After selecting to load the Template, the following window appears.

 

The following information/options are available in this window:
_____________________________________________________________________________________

GSE

Ground Support Equipment Number.

Type/Series

The Type and Series of the Ground Service Equipment item.

Omit Override checkboxes

Select the Omit Override checkbox to omit specific records (that have the Override checkbox checked) from being added to the template. The Omit Override checkbox appears in conjunction with the following selections: Load P/N Effectivity, Load P/N Positions, Load E/C, Load Task Cards.

Load / Don't Load P/N Effectivity radio buttons

Select to add (or not add) P/N Effectivity to the template.

Load / Don't Load P/N Positions radio buttons

Select to add (or not add) P/N Positions to the template.

Load / Don't Load GSE E/C radio buttons

Select to add (or not add) E/Cs to the template.

If Load A/C E/C is selected, the system displays the following. Use E/C Schedule Effective Date.

  • Use GSE "z+1" date as A/C E/C Effective Date.
  • Use Today as GSE E/C Effective Date radio button options (one must be selected).

Load Specific Maintenance Program checkbox

Check to load a specific maintenance program. Maintenance Programs are specified via Engineering/ Update/ E/C/ Other Tab.

Use GSE Service 'z+1' Date as GSE E/C Effective Date radio button

Select to use the 'z+1' date as the E/C's Effective Date. This option is not available when the Don't Load GSE E/C checkbox is selected.

Use Today as GSE E/C Effective Date radio button

Select to use the current day's date as the E/C's Effective Date. This option is not available when the Don't Load GSE E/C checkbox is selected.

Load / Don't Load Task Cards radio buttons

Select to add (or not add) Task Cards to the template.

_____________________________________________________________________________________

See Also

GSE Master Buttons

Notes Button, via GSE Master

Print Button, via GSE Master

Attachment Button, via GSE Master

Type/Series Button, via GSE Master

GSE Audit button, via GSE Master

Top of Page Publication Date: 11/12/2024 Share Print