Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
Select the Revision Control
The following information/options are available in this window: Originating Reference Original Engineering Control reference that requires revision. Revision The revision number of the E/C. This can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required. Authorized Date The date the new revision was authorized. Revised By The user who creates and/or authorizes the E/C revision. Revised Date The date of the new revision takes effect. Description The description/reason of the new revision. _____________________________________________________________________________________ |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||