Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Effect of W/O T/C Status Update on W/O E/C

When an E/C is linked to a W/O, thus creating a W/O T/C, the Status and Function of the E/C can be changed due to the Status of the W/O Task Card being changed. However, compliance of the E/C is still dependent on the closing of the Work Order as a whole, unless the Daily checkbox is selected in the W/O Engineering Control window.

Note: The change of the Work Order Task Card only takes effect on the E/C when the change is conducted on the last Task Card of the E/C.

The Status of the Task Card is changed during the work, as seen in the W/O Task Card window, opened by selecting the Task Card after selecting the T/C Work but_tc work (small) button, seen below:

In turn, changing the Status of the W/O Task Card can have an effect on the Status and Function of the W/O E/C, which can be seen below:

Changing the W/O Task Cards to specified Statuses has the following effects:

W/O Task Card Status

E/C Status

E/C Function

Cancel

Open

Upon changing the W/O Task Card Status to Cancel, a prompt asks the user to change the Function of the E/C to Do Not Reset. Selecting 'Yes' changes the Function to Do Not Reset and selecting 'No' keeps the Function to Reset.

Closed

Closed

Reset

Defer

Closed

Reset

Delayed

Closed

Reset

Hold

Open

Reset

On Condition

Closed

Reset

 

Note: When transferring the Task Card to a different Work Order, the Status and the Function of the E/C remain the same on the new Work Order. For more information, refer to the Transfer E/C button, via W/O Engineering Control.

See Also

E/C Button, via Work Order Detail

W/O Engineering Control, Informational Tab

W/O Engineering Control, Authorization Tab

Notes Button, via W/O Engineering Control

Task Card Button, via W/O Engineering Control

Transfer E/C Button, via W/O Engineering Control

Attachment Button, via W/O Engineering Control

Top of Page Publication Date: 11/12/2024 Share Print